Today I started to make the power point for the project. I’m using the SDLC whch is an abbreviation for System Development Life-Cycle. I have 9-10 Slides so far, that’s it.
Today I started to make the power point for the project. I’m using the SDLC whch is an abbreviation for System Development Life-Cycle. I have 9-10 Slides so far, that’s it.